-
-
2017.01
Chunhui environmental research and development of the "a comprehensive utilization of urban sludge treatment system" by the State Intellectual Property Office invention patent authorization.
-
2017.02
Shangyu District, the district government held in the Shangyu Theater 2017 economic work conference, Chunhui environmental protection was rated as the emission reduction of advanced enterprises at the meeting was commended.
-
2017.03
Chunhui environmental investment 1.5billion of a furnace a new project and investment of 6,000 million 2 #, 3 #, 4 # furnace ultra-low emission project officially launched
-
-
2016.01
Chunhui environmental protection staff in Shangyu Kaiyuan Hotel held 2015 annual summary and the company put into operation the tenth anniversary celebration party.
-
2016.04
Chunhui environmental protection made Provincial Development and Reform Commission contact list, on the "new day to deal with 500 tons of waste incineration power generation production line project" for technical adjustments.
-
2016.05
Chunhui environmental research and development of "a waste incineration boiler" and other 24 utility model patents have been authorized by the State Intellectual Property Office, the company has made a total of 28 utility model patents.
-
2016.05
-
2016.06
Chunhui Environmental Protection Acquisition Shangyu Zhenxing Solid Waste Treatment Co., Ltd. was formally signed.
-
2016.12
-
2016.12
Chunhui environmental protection production system through the Wan Tai energy management system certification, and further achieved energy efficiency.
-
-
2015.01
Shangyu Environmental Protection Bureau and the relevant experts on the company's waste fly ash curing program expert review, after the formation of expert review comments.
-
2015.01
Chunhui environmental pollution sludge incineration power generation project environmental protection facilities completed site acceptance meeting held. The participants gave a full affirmation.
-
2015.08
Zhejiang Province Vice Governor Huang Xuming in Shaoxing City Bureau of Agriculture Zhang A Dong, Shangyu District Vice Mayor Xu Yun, accompanied by inspection Chunhui environmental biomass power generation projects.
-
2015.12
China Circular Economy Association Power Generation Branch Secretary-General Guo Yungao and the surrounding waste incineration power plant related person in charge of Chunhui environmental inspection, Guo Secretary-General of the company's comprehensive utilization of resources to give the project fully affirmed.
-
-
2014.02
Shangyu District, the district government held in the Shangyu Theater 2014 economic work conference, Chunhui environmental protection was rated as energy-saving emission reduction Shangyu District advanced enterprises at the meeting was commended.
-
2014.03
Chunhui environmental protection convened sludge incineration power generation project and biomass incineration power generation project environmental protection facilities completion acceptance, provincial and municipal leaders and experts on the company sludge, biomass project acceptance.
-
2014.08
Chunhui environmental protection of biomass burning power generation projects through the provincial environmental protection three simultaneous acceptance.
-
2014.11
Chunhui environmental biomass power generation project by the Provincial Development and Reform Commission, the State Energy Bureau of Zhejiang regulatory office, the provincial power companies and experts to review, unanimously approved by the project completed.
-
-
2013.05
Chunhui environmental protection completed 1 # garbage bin bag dust collector to mention the transformation. After the transformation to improve the efficiency of dust removal, so that the amount of flue gas exports from the transformation before the 80mg / Nm3 increased to 20mg / Nm3, so as to achieve environmental emissions requirements. The project began in March, which lasted two and a half months.
-
2013.06
Chunhui Chunhui environmental sewage treatment station project started.
-
2013.06
Provincial leaders of the Ministry of Science and Technology, Shaoxing City, Shangyu City, the relevant departments and experts in the Chunhui environmental waste incineration power generation and comprehensive utilization of heating resources identified, the comrades after careful review, agreed to the project through the comprehensive utilization of resources
-
2013.10
Chunhui environmental protection investment 7 million yuan in addition to salt water renovation project started. Construction period of 4 months, is scheduled to be completed by the end of February 2014. The transformation of the river water as raw water, instead of tap water, the expansion can reach the annual water capacity of about 1.5 million tons, both cost savings and heating network to meet the heating needs.
-
2013.12
Chunhui environmental protection through the provincial and municipal leaders and experts on the company's sludge project three simultaneous acceptance.
-
2013.12
Zhejiang Province Environmental Protection Department issued a document (Zhejiang Central completed [2013] 117), on the Zhejiang Chunhui Environmental Energy Co., Ltd. sludge incineration power generation project environmental protection facilities (first) completed the acceptance of the letter, the project has been officially completed by environmental protection acceptance.
-
-
2012.11
Chunhui environmental protection investment 125 million yuan of biomass power generation project put into operation, the annual savings of 40,000 tons of standard coal, the new generating capacity of 72 million degrees, heat 660,000 tons.
-
-
2011.01
Chunhui environmental protection to do deep comprehensive utilization of resources industry, a total investment of 125 million yuan of biomass power generation projects by the Provincial Development and Reform Commission approved the project.
-
-
2010.05
Chunhui environmental protection Yang Yanzhong chairman was awarded Shangyu City model worker title.
-
2010.07
Chunhui environmental protection to complete the second round of capital increase.
-
2010.11
Municipal People's Congress Standing Committee special inspection Chunhui environmental pollution sludge incineration power generation project construction, Municipal People's Congress Standing Committee Xu Yaofeng, deputy director Ma Han children, Jiang Guoliang, Jin Guosong, Zhu Miaoxin, Xu Guanghua to participate in inspection, vice mayor Lu Jun Accompanied by.
-
2010.11
A total investment of 81.57 million yuan of sludge incineration power generation project a day to deal with sludge capacity of 250 tons of construction projects started for a test run.
-
2010.12
Chunhui environmental protection was named the first 50 in Zhejiang Province, "green low-carbon economy model enterprises."
-
2010.12
Provincial Development and Reform Commission issued a Chunhui environmental biomass power generation project service contact list, marking the Chunhui environmental biomass power generation project has been officially launched for the development of green low-carbon economy has taken a welcome step. The total investment of the project is to build a 130T / h high temperature and high pressure biomass direct combustion boiler, a 12MW back pressure turbine generator set and the corresponding supporting facilities and biomass treatment system.
-
-
2009.07
Chunhui environmental protection to obtain the daily processing of sewage 750 tons of incineration power generation project construction Provincial Environmental Protection Department approved the project a total investment of 81.57 million yuan.
-
2009.09
Chunhui environmental protection to obtain daily processing of 750 tons of waste incineration power generation project construction province Development and Reform Commission approved, the project included in the provincial key industrial construction projects.
-
-
2008.03
Chunhui environmental protection waste power generation project was included in the development of circular economy in Zhejiang Province, "991 Action Plan" key projects.
-
-
2005.12
Chunhui environmental protection "daily processing of municipal solid waste 500 tons of incineration power generation project" put into trial production, the total investment of 178 million yuan
-
-
2004.12
Zhejiang Chunhui Group together with the domestic small and medium enterprises board the first listed company new and into (stock code: 002001) co-investment founder Zhejiang Chunhui Environmental Protection Energy Co., Ltd.